-
This process is referred to as a power-on self test, or POST.
这个过程就称为加电测试(power-on self test)或 POST。
-
Both of these conditions are a normal part of the system self test.
这两种情况都是系统自检的正常部分。
-
What they do is complete this three minute test, called the self test.
他们要完成的就是三个测验,叫做自我测验。
-
Operation is enhanced by data analysis presentation and self test diagnostics.
数据分析展示和自我测试诊断使操作性能得到提高。
-
One of the Uninterruptible Power Supplies (UPS) at the office has failed the battery self test!
办公室一个不间断电源(ups)自检失败!